Electrical works for the installation of new POD’s within the Data Centres, supported by redundant UPS & battery systems. The projects are often required to be designed, quoted & completed in a compressed time frame.
Level Electrical were able to respond to this and ensure all required resources were available to meet all deadlines on time.
Scope included UPS setup & assembly services, heavy duty sub-mains & cable support systems, POD & rack level dual redundancy power systems, data cabling & connections for monitoring of all power devices.
Ready to take your project to the next level? Call us on 02 6260 1906
© 2024 ASN Electrical Pty Ltd. All rights reserved. ABN: 11 112 806 452