We provide reliable project management for major asset installations and retrofits. We are also proud to have extensive experience in working with large government and private sector clients in complex facilities.
Our projects team of 40 people is supported by a fully owned fleet of specialist plant and equipment. Specialist subcontractors undergo a thorough screening process to ensure that they can be engaged with confidence.
We have a dedicated project manager for every project backed by a construction manager and a contract administrator, so you will have support every step of the way – from planning and preparing for the job through to clearing the area once work is completed.
We understand that plans sometimes change – we are flexible and adaptable, and we will always be available when you need us. Our modern job management systems ensure that nothing will be overlooked. Our project services are supported by ISO-certified integrated systems and procedures. Our systems ensure the safety of staff and clients and provide seamless processes through to completion, with strict document control from commencement to handover.
Everything about the way we work has one goal: To deliver expert plumbing solutions and exceptional customer service on every project.
Client: Department of Parliamentary Services Duration: 3 months |
|
|
|
|
|
|
|
Parliament house early infrastructure works consisted of removal and replacement of redundant services to make way for new services, installation of new services, pump, valve and manifold replacements.
Client: FDC Constructions
Duration: 8 Months
|
|
|
|
|
|
Hydraulic works to specialist labs and kitchenette. Installation of tempered water eye wash units, installation of ring main flow and return hot, cold and RO water supplies. Installation of backflow devices, commercial heat pump hot water unit and fit off of specialist tapware and equipment
Client: Renascent Australia
Job Value: $2,200,000
Duration: 7 Months
|
|
|
|
|
|
|
Mechanical Pipework replacement of over 1000m of pipework, thorough site investigation, scanning and excavation in heavily service impacted areas, Installation of HDPE Sleeved copper pipework varying in sizes from 50mm up to 150mm both under and above ground. Installation of new valve pits and reinstatement of surfaces back to new.
Client: Built
Duration: 11 Months
|
|
|
|
|
All hydraulic and civil stormwater works required for the construction of a new performing Arts Centre comprising of an Auditorium, Drama Studio, Dance Studio, Music Studio, and other associated spaces.
Client: Direct
Duration: 5 months