Hard Rock Crushing Plant Upgrade – Possum Brush

When Level Electrical Taree was engaged to upgrade the motor control centre at a hard rock crushing plant in Possum Brush, the goal was clear: bring the site up to current electrical standards while improving safety, efficiency and performance.

Led by Jeff Brown, the team delivered a complete electrical upgrade that has significantly enhanced both safety and productivity for the operator.

Level Electrical team delivering commercial electrical infrastructure upgrade in Taree NSW

 

Smarter systems, safer operations

Level Electrical Taree designed and installed a new control circuit, converting it from 240V AC to 24V DC - a critical improvement that eliminated the risk of electrocution from the control circuit.

The motor control centre was also upgraded to allow remote isolation of motor drives, grouped in zones to reduce the chance of arc fault injuries during isolation and maintenance.

A new Allen-Bradley PLC and SCADA system was introduced to automate the entire plant, delivering greater visibility, faster fault-finding, and measurable productivity gains.

“The new system has completely modernised the way the plant operates,” said Jeff Brown. “It’s safer, more efficient and built for reliable long-term performance.”

Untitled design 6

A partnership built on reliability

Level Electrical Taree continues to maintain and support the site’s electrical systems - ensuring reliability, compliance and continuous improvement. Their close working relationship with the plant’s operators has allowed ongoing upgrades and refinements as the site evolves.

 Taree WEB 72

Setting the standard

The project reflects Level Electrical Taree’s capability in complex industrial environments, combining planning, precision and modern automation to deliver safer, smarter operations.

Level Electrical Taree continues to set the benchmark for technically demanding electrical projects - from heavy industrial sites to large-scale control systems. Their focus on reliability and performance makes them a trusted partner for businesses that demand results.

Level plumbing and electrical Members working on an infrastructure site in Australia

 

Client: Hard rock crushing plant, Possum Brush NSW
Project lead: Jeff Brown, Level Electrical Taree
Project partners: Haymans; Adam Berwick (PLC and SCADA programming and design)

Ready to discuss your next industrial or automation project?